Some water leakage from roof after heavy storm. Placed additional fasteners in metal roofing.
Pulled 110 feet of 4-4-4-(removed #6 ground) aluminum wire from service box to meter stack. Set two grounding rods.[This was later found to be not to code. Grounding happens at meter end, not surface end.]
Assembled used picnic table from the West Side Wonder Wall.